Sign In | Join Free | My fnxradio.com |
|
Brand Name : Harzone
Place of Origin : China
MOQ : negotiation
Payment Terms : According to detailed order
Delivery Time : negotiation
Packaging Details : According to detailed order
Material : steel
Feature : large span
Capacity : Heavy loading capacity
Status : Sefl Fold and Unfold
Product name : Tracked Load LD-60 Emergency Bridge Mechanized Bridge
Condition : New
Warranty : 1 Year
Application : emergency bridges
Span : 17-51m
Emergency Rescure Fast Erection 51m Mechanized Bridge
Description of Emergency Rescure Fast Erection 51m Mechanized Bridge :
Emergency Rescure Fast Erection 51m Mechanized Bridge is a set of temporary large span bridge equipment carried by erection vehicle, accomplishing the erection and retrieval operation by the erection vehicle,which can be assembled into an emergency bridge rapidly to ensure all sorts of vehicles to go across quickly.
Emergency Rescure Fast Erection 51m Mechanized Bridge is used to fast erect a temporary bridge of 17-51m, 4m wide to ensure all sorts of vehicles with the tracked load of up to 60t or an axle load of up to 13t to go across obstacles including rivers and dry ditches.
Emergency Rescure Fast Erection 51m Mechanized Bridge possesses the feature of decent flexibility, large single span, humble structure, quick erection, high mechanization and less manpower. Moreover, it has the benefits of suitable transportation and favorable adaptability of bank.
Main features of Emergency Rescure Fast Erection 51m Mechanized Bridge:
1Excellent cross country performance: Cross country chassis (8×8 erection vehicle, 6×6 transportation vehicle)
2 Large single span: max. single span reaches 51m
3 Less composition unit: one erection vehicle, six transportation vehicle
4 Fast erection: 90min (To erect a 51m bridge)
5 High mechanization level, low labor intensity: using remote control operation
6 Less operators: 3-4(not including drivers)
Emergency Rescure Fast Erection 51m Mechanized Bridge is used to fast erect a temporary bridge of 17-51m, 4m wide to ensure all sorts of vehicles with the tracked load of up to 60t or an axle load of up to 13t to go across obstacles including rivers and dry ditches.
![]() |
Emergency Bridge To Rescue Fast Erection 51m Mechanized Images |